Constellation was supposed to spare the Navy the trouble of designing another warship from scratch. During the first Trump Administration, the service chose an existing European frigate design, then kept changing it. By 2024, the lead ship’s April 2026 delivery date had slipped to a 2029 forecast. Last November, the Trump Administration terminated four of the six contracted ships. The other two remained under review when the Government Accountability Office reported this April.
Congress now faces a Navy request for $65.8 billion in FY2027 shipbuilding money and 34 crewed ships. Alongside that expansion, Congress should fund long-term contracts for American commercial shipping, including assistance for domestic construction. The longer the U.S. waits, the further it falls behind China.
Who pays for the next ships?
President Reagan’s March 1981 budget proposed no new commercial construction-subsidy appropriations for FY1982 as his administration prepared the 600-ship Navy. American builders already faced longstanding cost disadvantages and foreign competition. Naval orders brought years of work, followed by a smaller fleet and falling defense demand after the Cold War.
Matson has committed roughly $1 billion to three new containerships at Hanwha Philly Shipyard. Makua, the first, was christened on October 10. The company plans to replace older vessels and add capacity on its Hawaii and China–Long Beach services. Those are routes Matson already serves. Deliveries begin in early 2027 and continue through 2028.
Washington already pays commercial operators for maritime availability through the Maritime Security Program. Participating American-flag ships carry commercial cargo and remain available for defense needs. The commercial contracts proposed here extend that principle to new domestic construction. Before placing orders, owners receive a federal payment commitment for specified American service and wartime availability over an agreed term. Banks evaluate that revenue alongside the freight business. Title XI guarantees reduced financing risk, and construction assistance helps cover the American building premium.
For new coastal service under this proposal, the Maritime Administration will compare bids for additional routes or capacity. The assessment includes cargo commitments and terminal costs alongside the ship’s price. Where trucks and trains compete for the same shipments, the comparison includes the full trip and transfers at both ends of the sea leg. Incumbents compete with new operators on the federal payment required to provide the service. Existing ownership of ships or a domestic route carries no entitlement to an award.
Under these fixed contracts, owners bear construction overruns and lose freight revenue if demand falls short. The government stops payments for service that isn’t provided. If the ships sail as agreed but carry little cargo, however, the federal payment continues through the contract term. Operators still absorb the lost sales, and poor results disqualify the route from further expansion assistance. The initial commercial awards remain obligations for their agreed terms, including the weak performers and Congress pays the American cost premium throughout those contracts, without counting on future productivity gains to make the service affordable.
Finish the design
Complaints about American shipbuilding are legitimate, but they’re just as much a function of shifting priorities and incompetence as they are problems with industrial capacity.
Navy Secretary Carlos Del Toro certified Constellation’s design complete in 2022, and construction began. GAO subsequently found that the certification met the law’s requirements even though the design remained incomplete under leading shipbuilding practices.
The earlier littoral combat ship program had proceeded through a similar gap between procurement commitments and technical readiness. George W. Bush’s administration began LCS, Obama committed to block purchases before mission systems were mature, and the Navy dropped the anti-submarine package under Biden in 2022. Surface-warfare and mine-countermeasures roles remain. GAO reported this April that more than $20 billion across small surface combatant programs hadn’t supplied needed fleet capabilities, alongside early retirements and abandoned missions.
President Trump’s August 13 memorandum, meanwhile, calls for a plan to replace electromagnetic aircraft launch and advanced weapons-elevator systems on the aircraft carrier CVN-81 with the older steam and hydraulics system that, notably, we likely don’t have the competence to build anymore.
Ford’s strike-group commander reported more than 11,000 fixed-wing flights during its recent deployment and praised the launch system. Naval Air Systems Command credits it with a wider aircraft-weight range and lower staffing and maintenance requirements. President Trump should withdraw the replacement-planning instruction for a few key reasons before you even get to the technical reasons. The most important is that delaying the deployment of new carriers threatens to take the already spread-thin carrier fleet (just look at the Iran conflict if you need any indication of the problem) means even more years running obsolete Nimitz class ships into the ground and creating massive production backups in yards that need to be churning out new ships. China is going to be pumping out aircraft carriers in the 2030s. Delaying American matching power is a recipe for a surface combatant mismatch disaster in a near-peer conflict in the next decade. And let’s be clear-eyed about the types of ships China is set to deploy. These aren’t the comically weak, structurally deficient ships that China was mocked for in the 1990s and early 2000s. Chinese yards have learned and Chinese planners are producing state-of-the-art warships at a scale that will dwarf the American fleet. China is set to outcompete the United States both in quantity and quality in the imminent future. Delaying our carriers by years over clearly erroneous nostalgia and aesthetic appeal is detrimental and clearly not in line with a pro-America foreign policy.
Another repair yard, and people to run it
American attack submarines lost more than 15,000 operational days to maintenance delays and active idle time during FY2016–2025, the GAO reported in August. Crewing and sustaining the unavailable boats cost an estimated $3.4 billion. Retired submarines awaiting reactor defueling form a separate queue, and their inactivation competes for facilities with work on boats the Navy expects to return to sea. Repair expansion begins with ships already waiting for work, before any allowance for wartime damage.
President Trump’s fifth-yard proposal calls for a Pacific repair location and up to three submarine dry docks. Puget Sound’s seismic risks have already required emergency work. If a disaster or attack closes a major yard, more repairs fall to the remaining facilities. The existing four also require modernization: GAO’s September assessment put that work above $200 billion under current plans and warned that completion could take more than 50 additional years.
There’s a strong case to be made that before we invest in a fifth yard, that we should build out the existing four. Undoubtedly we should probably do both. However, if we’re going to prioritize one, now, the creation of the fifth location edges out the expansion plan. The rationale for this has two parts. First, it sets the stage for later development. That’s a net win. Second, and perhaps a bit darker, it disperses potential targets in the event of a kinetic or cyber confrontation in the future. America’s ability to build and repair the fleet should not be consolidated. Dispersed industry is critical when taking a sober assessment of the threats that are likely looming on the horizon over the next years and decades.
Nuclear-submarine maintenance is the proposed initial mission for the fifth yard. Carrier repairs require larger docks and different facilities, with a separate construction bill. Opening individual facilities in stages brings repair capacity into use as it becomes ready; meanwhile, qualified private yards can take suitable work. In the proposed funding plan, each stage has a cost estimate and a date for accepting ships, tied to power and water service, qualified suppliers and trained crews.
Recruiting in a new region and training apprentices under experienced personnel on rotating instructor assignments takes longer than hiring from the existing yards. Pulling experienced workers away also reduces the labor available for the current backlog. Pay for additional qualified people, including the time spent training them, in the expansion budget. Recruitment for the fifth yard then competes with the Navy’s construction programs, Coast Guard ships and the proposed commercial expansion.
At the fifth yard, clearing the existing backlog creates pressure to fill the new docks with scheduled maintenance. Filling every slot leaves no immediate opening for battle damage. Congress should fund construction of the fifth yard and include a defined reserve of dock time, qualified crews and equipment in its operating budget. Keeping that reserve available sometimes means paying for capacity that goes unused. The Navy retains somewhere to put damaged ships without first displacing all the work already scheduled, and another repair location if a major yard becomes unavailable.
American ownership has a cost
Senator Mike Lee and Representative Tom McClintock propose loosening the Jones Act’s domestic-carriage restrictions. Their economic argument is serious: foreign-built ships cost less, and additional competitors could improve service, particularly for island communities. Lee’s Open America’s Waters Act bill removes construction and ownership conditions from the coastwise-endorsement provision. Representatives Ed Case and James Moylan propose a separate opening to qualifying allied ownership and flags, along with relaxed American crewing requirements.Unfortunately, despite the calls for an easy fix targeting the Jones Act, the reality is this would just be the sugar high rather than actually fixing the problem in any meaningful way.
If domestic construction costs prevent an order altogether, allowing an American owner to buy abroad can add a ship and American crew jobs without displacing an American order. Rejecting that possibility doesn’t make the ship affordable. Buying abroad leaves the building work and production experience overseas. Admitting foreign crews also directs employment away from American mariners.
Under the commercial contracts proposed here, Congress pays the American construction premium even when overseas purchases offer more American-operated ships for the same expenditure. The additional service remains under American ownership and crewing requirements. Domestic operators retain access to their market, but face competitors bidding for the public support to expand it. Freight customers get additional choices without transferring domestic routes to foreign operators or directing the crewing work overseas.
The Administration’s commodity-shipping waiver runs through November 15. Each voyage receives review, including an assessment of American vessel availability. Emergency access can relieve an immediate shortage; however, repeated extensions make the terms of a long-lived American ship investment less dependable. Under the proposed service contracts, recurring shortages identified in those reviews become the basis for soliciting additional American service. Bidders weigh the proposed federal revenue commitment against the cost of ordering ships.
Simply accepting that the United States has defaulted on its role as a ship builder seems particularly contrary to the push to “Make Shipbuilding Great Again” touted by the President and his allies. Repealing the Jones Act or making significant modifications to allow foreign owned and flagged vessels to move goods between American ports is short-sighted. Give it a few years and a few billion dollars of investment and let’s have trustworthy, well-paid, American flagged and crewed ships operating in U.S. territorial waters. Acquiescing to Chinese dominance of America’s domestic port-to-port transfers is not only a threat to sovereignty, but also a clear issue for American security.
By 2023, Chinese yards produced more than half the world’s shipbuilding tonnage, according to the U.S. Trade Representative’s investigation. Continued access to Chinese construction, components and repairs cannot be assumed during a confrontation with Beijing. Chinese military authorities also draw on parts of the civilian maritime sector. Naval War College research documents maritime-militia intelligence reporting to operational People’s Liberation Army forces, along with military training and mobilization obligations for scientific personnel.
Operators subject to Beijing’s military direction have no place in American domestic carriage. Independent ownership of Chinese-built ships presents a separate equipment and maintenance problem: continued operation may depend on Chinese suppliers even when Beijing doesn’t control the shipping company. The congressional port investigation documented Chinese crane maker ZPMC’s repeated requests for remote access to American cranes. Federal assistance for new ships and port equipment can pay for alternative suppliers and maintenance arrangements before a crisis interrupts the existing service.
Of course, ownership restrictions don’t eliminate the danger of concealed military equipment. Ukraine’s Operation Spiderweb used drones hidden in truck-borne structures, and the Navy demonstrated a containerized SM-6 launcher aboard USS Savannah in 2023. American ownership doesn’t prevent those capabilities from traveling through ordinary cargo channels, but it certainly will reduce the possibility of the ship and crew being complicit in a planned attack. Inspection, clearly, remains necessary alongside control of the operators and crews running domestic services.
Give the program an accountable leader
President Trump can give a senior maritime coordinator a role in the Office of Management and Budget’s review and direct agencies to reconcile their schedules before requesting funds. If we need to add some flair, we can call the coordinator a Czar, or maybe a Grand Admiral, whatever we need to get it done. Under that directive, the coordinator resolves competing claims on scarce workers, even when every agency can defend the urgency of its own program.
The review covers Navy, Coast Guard and Maritime Administration plans alongside Commerce and U.S. Trade Representative proposals for allied investment and trade. New assistance requires congressional authority and funding; accordingly, the SHIPS for America proposals offer a legislative starting point.
Require the coordinator to report annually on ships ordered and delivered, commercially employed vessels, mariner jobs and completed repairs against the agencies’ commitments. For commercial awards, that report puts freight demand and the federal payment alongside the separate cost of additional defense availability.
The United States stands at a critical juncture in both our naval and commercial shipbuilding. For the better part of the last decade, smart people have been identifying the problem and have proposed a wide array of practical and positive solutions. The real issue has been failure of implementation rather than failure of imagination. Unfortunately, the longer the United States dithers and runs itself in bureaucratic knots, the further it falls behind China. We no longer live in the 1990s and 2000s where we have decades to take the time to turn the proverbial battleship of industrial production. We are facing imminent, near-term, near-peer confrontations, either kinetically or economically, with China. It is insufficient to merely arrest decline, but rather the United States must, for both national security and economic independence, reassert its industrial might across the oceans.